Construction Progress of Home X

Floor Plans, Levels 2-7

Floor Plans, Levels 2-7 – 11/05/2022  The rest of the floors of Home X is accommodation – on floors 2-7 the interior layouts are the same, thus the floor plans are the same. The rooms colored with dark purple can hold four people (two double beds) and the light purple can hold two people (one Read More…

Ground Floor Plan – 10/05/2022

Ground Floor Plan The ground floor of Home X is a dedicated commercial space (red coloring) for the public with residents quarters located towards the back of the building (purple and grey coloring). Access to the commercial space is at the front of the building in two separate space that can only be entered from Read More…

Dumper – 24/03/2022

Dumper A dumper is used to deliver loose materials such as soil and gravel from point A to B across a construction site. They move materials away from a location so work can continue. Unlike dumper trucks these have the load in front instead of the back so the driver cab is located in front Read More…

Excavator – 23/03/2022

Excavator Mini Excavators have been used on site at Home X. Naturally, as the mini excavator is smaller compared to an average size excavator is has a smaller tail swing, thus its easier to control – perfect for tight spacing in urban areas. However, as it is smaller it can hold a lot less material Read More…

STEEL INFILL WALLS & SHEATHING- 14/03/2022

Installation of steel infill walls for Home X, is near completion. Choosing metal infill walls has many advantages. Metal infill walls are obviously fire resistant compared to traditional timber infill walls. Having metal studs aids the 30 minuets of fire resistance that Approved Document B states must be present in all new builds (HM Government, Read More…