Once a house is weathertight, work can commence inside. I am unsure of what is going on on the inside, but I do know that the plasterers can’t work at the same time as the initial electrics are being done. This means that the process on the inside may take some time and that I would not be able to update my blog as I cant see what is going on.
Heating and cooling needs are addressed. Vents, ductwork and the heating and cooling units need to be installed.
An electrician often comes out during this stage and finishes up adding outlets and lighting fixtures.
Approved document H states that a plumbing design must include two systems: the system that supplies water and the system that gets rid of waste. The drain system also has vent stacks that allow drainpipes to breathe and move sewer waste through the sewer pipes.
Approved Document P contains guidance on electrical safety in dwellings, including detailed information about what procedures need to be in place and who may carry these out.
What is next?:
The last stage of construction involves putting the finishing touches on the building. This involves installing flooring, painting the walls, putting countertops in or adding faucets in the bathrooms.