Introduction To My Blog

(Before)

 

My construction site is 2 bedroom detached bungalow that is currently getting rebuilt.

It was constructed in 1995, was in poor condition and then fully refurbished throughout. However, the owners weren’t satisfied and decided to demolish and rebuild this bungalow, bigger and better.

Old specifications:

  • Large Plot
  • Two Double Bedrooms 14’7 x 12’5 and 11’8 x 10’7
  • Large Lounge/Dining Room 22’8 x 12’4
  • South Facing Conservatory 12’2 x 9’5
  • Fitted Kitchen/Breakfast Room 17’4 max x 8’6
  • Spacious Shower Room /WC
  • South Facing rear Garden
  • Garage
  • South Side of Coast Road

This plot of land is at a height of 45 meters above sea level. Geo-coordinates of the address is Lat: 50.78668900, Long: 0.01883500.

Building a house on a cliff requires specific considerations, for example; you may need to protect your home from the elements, such as high winds and the effects of sea salt from sea spray. Special building materials may be used to help withstand the sometimes harsh marine environment.

SPR Carpentry & Construction Ltd

SPR is a small family owned construction company that is currently rebuilding this property. On their page, they have named this their ‘Peacehaven Project’. The budget for this building is unknown, as it is being paid for by a private home owner, but I do know that this project is going to take a year approximately to be completed.