First day, getting started.

The first day of the design week, I was introduced to my fellow group members that I will be working with for the whole week. We were also introduced to our project, which was to create a bridge for people and cyclist to use crossing the Lewes Road to or from mithras.

After being acquainted with one another we took a short sit visit to mithras house to get a feel of the size of the site so we can make our project.

dsc_0701 dsc_0704 dsc_0703 I took photos of the site being more focused on the aesthetic and technicalities of the site, seeing how things move and flow throughout the place.

After the site visit we gathered around and have a brief discussion about design ideas and how we want to move forward. I took notes and observed some of my groups ideas. I basically questioned the ideas and design to make sure that we don’t create a design that isn’t constructable or acceptable.

After having a vague idea of what to do, I took my free time to do some research on bridges and some design ideas so I can share that with the other members.

Leave a Reply

Your email address will not be published. Required fields are marked *