Part 4 – Design Development

With the acquired information, we set out designing a bridge footprint that would tick all the necessary boxes.

Our initial design was an L-shaped bridge, connecting Mithras Car Park, Preston Barracks and Watts Car Park. While this img_2281proposal met all requirements set by the brief and regulations, we concluded that it could be more inclusive to the general public by simply providing a method of crossing the road rather than only landing on university sites.

 

 

 

 

We then revised the design and added a branch which lands directly onto the Lewes Road walkway to encourage public use:

img_2285

 

Leave a Reply

Your email address will not be published. Required fields are marked *