Day 3 came round the corner quicker than we expected.

The aim of the day was to start constructing our bridge, however we had a slight hiccup as we were one man down as one of the Hazelwick students wasn’t part of the project no more. Therefore, that meant we had to step our game and crack on with our day as it had a lot of work load.

Tasks-

~ Measure materials and cut to the correct scale. In this case we had the scale 1:150

~ Sketch up a detailed drawing of the final design

~ Start building the bridge

~ Start working on the poster

Taking control as team leader, I set each individual with their own tasks such as :

~ 2 members cutting the materials to scale

~ 1 member was assigned to draw the detailed sketches as his drawing skills are amazing.

~ 2 members dealing with the poster

20161113-174727.jpg 20161113-174743.jpg

Materials cut down to scale, ready for assembling

Materials cut down to scale, ready for assembling

 

However, plans just didn’t go to plan. My team didn’t use there time efficiently as some tasks took longer than needed which gave us a set back and we wasn’t able to start constructing on day 3. which meant we had no time to waste and we had to put pressure on ourselves to get it done on time.