Alex Judd 04 – Site Levels – RevA

Reason for Revision A

Upon reflection in our group, we have decided that crossing from Preston Barracks to the Mithras House entrance would be too high up off the ground and would pose more problems in relation to who uses it and how it is accessed.

We have decided to go for bridge option 2 as mentioned in the first revision. This involves positioning the bridge to the most northern part of Mithras House car park and then spanning over to the proposed central square at the Preston Barracks development OR Watts car park dependent on Preston Barracks development outcome.

The levels won’t be affected per se however we will be bridging from the 30m above Ordnance datum as opposed to the original 35m, this reduces wind loads but also mean that the ramps and accessibility aspects which were a concern in the first instance are drastically reduced.

Leave a Reply

Your email address will not be published. Required fields are marked *