Thursday

The day went by fast! With so much do to the team barely had any breaks and started the day already focused and producing so the model could be done by the end of the day!

We set up a production line and diveded tasks to each team member so things could be done more efficiently. By the end of the day the model was almost done, tomorrow it will just need the finishing touches!

We also started working on our poster, making diagrams and sketches to enrich the content of it. Hope tomorrow will be a productive day and everything will be ready for the presentation!

IMG_4450

IMG_4451

Monday 10th + Tuesday 11th

Monday 10th:

We started the day being introduced to the proposal of the health clinic, and got divided in groups. We spent the morning and part of the afternoon brainstorming ideas and researching precedent studies and possilble solutions for our design to fit the criteria of the brief.

In the afternoon we had a lecture with Emmanuel  about what were the spaces needed in a health clinic and what were these spaces relation, what had to be next to each other and which flow the ambiences had to follow. We then started sketching layout ideas that would attend all the needs of the health clininc, so that in the next day we could finish our final layout and start our test models.

 

Tuesday 11th

Today the work was developed in the modeling room, in the morning we took the sketches of the layout from the day before and scaled them to a final layout for the clinic. We also worked on a model for our folding box concept.

1:20 Folding Box

 

We then started to work on test structures for the tents we will be using in the health clininc, we built 3 different concepts to find a solution that is functional and structuraly stable.

IMG_4444

IMG_4448

Tomorrow we will start working in our final model!!