Rob Smith, Team Fleming, Thursday 14th and Friday 15th

Thursday 14th: today is the day where over-tiredness starts to rear its ugly head in the form of sloppy workmanship (from me) and irritation. The day started off as it intended to continue SLOWLY. Myself and Josh carried on making the model and Gabby started to format the information we had gathered into a clear concise A1 poster.

IMG_20141111_091944_117

After lunch the model was pretty much finished so we busied ourselves writing up information that we may use on our poster, information gathering and more model making.

Th day slowly plodded on until 6am when we decided to call it quits. However we had decided to info gather when we got home.

 

Friday 15th: Today started off OK. The kids were in nice and early to help us clean up the mess which was substantial. The main priorities for the morning were to finish the site boundary fence as well as finalizing the internal layout drawings.

IMG_6012

IMG_20141112_121243_004

(I don’t know why I look so worried)

CRIT TIME

We set up in the adjoining room, the model, small sketches and the poster. Looking very professional.

20141114-130809.jpg

The lectures were very kind (compared with a crit in the Architecture department) which was a relief. The size of the purposed buildig was a bit of an issue with Noel and Kemi but as we stated early on in the speech the design is modular so there is allowance for far more ground to be covered. However we were commended on our design of movement through the spaces.

Overall I have enjoyed this project and hope to do something similar to this in the future.

 

 