Mid morning: the team struck upon something that had been overlooked in coordination between internal and external structures.
The awesome roof shell George has been working on, when placed into position above our internal structure, comes into contact with Chris & Marcelas rooms due to their ceiling height.
After agreeing we could not rebuild the roof with our time available, and cutting the bottom off of the rooms would reduce ceiling height (undesirable) and compromise the representative quality of our models, a discussion with Noel found a resolution:
For presentation purposes we will continue, building a low perimeter profile to raise the shell the required height off the ground to give us the needed space.
Should the design be developed for use in real life, we would specify the shell be either slightly wider to gain the height needed without altering the shape, or specify a more vertical profile at the lower part of the shell.


