The second day started with an early visit to the site we are working on for the rest of the week, students are tasked with building a washroom and toilet block facility for a fictitious campsite using a number of different methods, the teams are split into the block and beam floor and wall team, the drainage team, the water supply team and the carpentry team.

The morning was spent being inducted into the site, having health and safety briefings and manual handling training and then splitting into the teams and beginning the task.  The carpentry team studied the drawings and prepared cutting lists ready to begin work tomorrow, the brick and block team planned their work and were familiarised with their materials, the water supply team learnt how to joint the pipework they will be laying and the drainage team had a steel fixing workshop in addition to planning their work.

In the afternoon, we visited two local construction sites to gain an understanding of how large scale construction works, being shown around by the project teams who explained all the different processes happening on site, this was a useful insight for the students and gave them an excellent opportunity to see how real construction sites operate.  Tomorrow the hard work begins with a full day of construction!

This slideshow requires JavaScript.

Leave a Reply

Your email address will not be published. Required fields are marked *